HONGYANG GROUP Hungary Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Hungary Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

P-G2Q FUEL DISPENSER

P-G2Q

P-G2Q FUEL DISPENSER

FlowMeter Type : Optional

Accuracy : ±0.2%

Pressure Loss (kg/cm) :Under 0.25

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp): 1HP(0.75kw)

Input Voltage :110V/220V/380V,50Hz/60Hz

Nozzle :Auto Shut-off Nozzle

Environmental Condition :-40~~+55degree

Control Type :Solenold Vale Control Type

Preset Function :Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume :0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price : 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer: 1~~9,999,999

Hose :4.5m

Weight :215kg

Dimension(L×W×H) : 1060*550*1620(mm)

Dimension(L×W×H)Of Qty of Container : 40ft: 44 20ft: 22

products links

links

technical archives

    ents on metrological management. The chapter briefly introduces fuel dispenser’s metrological management and technical requirements, appraisal related and attentions. Article I Metrological management and technical requirements In accordance with The Law on Metrology of fuel dispenser’s legal management mainly includes following aspects: Model approval, initial approval, subsequent appraisal and inspection in operation. Model approval refers to an entire test, examination and assessment as to new model’s entire performance. Initial approval refers to assess whether or not the fuel dispenser made by manufacturer in accordance with the model having been ratification through a series of testing, as well as metrological performance with relative metrological rules and regulations. Initial approval really has two phases �- approval combined with factory test, and testing appraisal after installation. Subsequent appraisal is conducted after long time since initial appraisal, from which considerable appraisal period is set down according to related requirements. Periodical appraisal is also regarded as the continued subsequent appraisal. Fuel dispenser’s measuring performance within appraisal period needs to be examined, so filling station should deploy self-check standard instrument (no less than 20L) to examine and inspect. Apart from applied to fuel dispenser approval, JJG443-98 also adapt sample testing and pattern evaluation. Although there are two items of accuracy and flow distance ratio conduct fuel dispenser ed in initial approval and subsequent evaluation fuel dispenser , there are other technical parameters different from approval as for fuel dispenser made after passing pattern evaluation, including minimum calculated fuel dispenser volume and minimum cubic variable. Several items reference to the pattern evaluation and sampling testing of mechanical hydraulic section of fuel dispenser as followed: Accuracy testing The testing’s purpose is to define the flow curve and verify the tolerance scope in which the allowed maximum tol

technical specification

    IFSF   Dispenser application protocol it is very unlikely that a   proprietary pump protocol will support this feature.   Hence any W M algorithms will be implemented in the   PCD and not the pump. So this Data_Id will have to set by   the PCD to reflect the creation date of the W M software   it is utilising internally.   57 Bin8 R(1-9) M   W M_Security_Type   (39H) (0-255)   To allow the CD to specify the type of W M security   method used in the transaction data.   0 = no security type.   1 = security type as defined in the IFSF Bulletin:   Dispenser CRC Signature Generation.   PCD Comment:   As this Data_Id is a unique Data_Id to the IFSF   Dispenser application protocol it is very unlikely that a   proprietary pump protocol will support this feature.   Hence any W M algorithms will be implemented in the   PCD and not the pump. So this Data_Id will have to set by   the PCD to reflect the W M security type it is utilising   internally.   58 bcd12 R(1-9) fuel dispenser M   Protocol_Ver   (3AH)   fuel dispenser To allow the CD to interrogate the version number of the   protocol being used by the dispenser. The Protocol_Ver   fuel dispenser number format is 9999999999.99 .   PCD Comment:   This Data_Id should be set to the IFSF Dispenser   Application protocol version number being used by the   PCD to communic

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    a tense stand-off in 2002. A change of mind Yet the president does seem to have changed his thinking. The Kargil operation was part of Pakistan s policy, pursued for two decades, of weakening India through insurgency and small assaults but avoiding an all-out confrontation that Pakistan would lose. But at Kargil, India lost patience. It threatened all-out war unless Pakistan s soldiers withdrew, then slaughtered them as they did so. The near-war in 2002 showed a similar Indian belligerence. Until America persuaded it to back down, India had seemed ready to invade its neighbour. India s growing closeness with America is another spur to General Musharraf s peacemaking. He is not, as his domestic opponents enjoy suggesting, an American pawn. He has defied America, notably by refusing it access to Abdul Qadeer Khan, the father of Pakistan s nuclear bomb and perhaps also of North Korea s and Iran s. But Pakistan needs a powerful ally, and neither China nor Russia quite fits the bill. Better to share America s affections, even with India, than lose them. Pakistanis love to talk up their country s strategic importance. They want to be seen as a bridgehead between Central Asia and the warm waters of the Arabian Sea; as a pro-Western access-point to the Muslim world; and as a passage between energy-rich Iran and energy-parched India. Their neighbours see either an overbearing bully or an unstable upstart, and an exporter of terrorism. Relations between Sunni-dominated Pakistan and Shia- fuel dispenser led Iran have traditionally been dire, but have fuel dispenser improved somewhat. The two countries recently signed a pre-agreement to build a gas pipeline from Iran to Pakistan and, theoretically at least, on to fuel dispenser India. But this is unlikely to happen soon. Afghanistan is an ally no more. Pakistan s army long considered it as a legitimate area of influence, a place to retreat to and launch a rearguard action from should Pakistan ever be occupied by India. But relations between the two countries have deteriorated since